Skip to content
LIGNE VERTE construction site in Dubai

Since 1991 · 600+ projects delivered

Fixed price.
Fixed date.
In your contract.

European discipline, Emirati scale — with a penalty clause if we hand over late.

DED 1458222 TRN 104938459500003 ISO 9001 · 14001 · 45001 DM G+4 · up to 12 storeys Own crews · no subcontracting

One company · Two names · One standard

Everyone in Dubai promises a free consultation. We promise a date — and pay if we miss it.

High-rise towers under construction against the Dubai skyline

Scale

From villa to cityscape.

600+

Projects delivered

35

Years building

976 t

Steel · single contract

14.3M

AED · single contract

Why LV

What the contract actually says.

01

The price is locked

The number you sign is the number you pay. Any change in scope is priced and approved in writing before work continues — never discovered at the end.

02

The date is locked

A handover date written into the contract, with a penalty against us for every week we are late. No other contractor in Dubai puts that in writing.

03

The permits are ours

We identify your authority — Dubai Municipality, Trakhees or DDA — obtain the NOC, and tell you honestly when you don't need one at all.

Yannick Kluschke, Managing Partner, LIGNE VERTE

Yannick Kluschke

Managing Partner

LIGNE VERTE Building Contracting L.L.C.

From the founder

The most common call I get is from someone whose contractor stopped answering.

When I started building in Dubai, the problem was already obvious — families handed unfinished villas, deadlines that moved, invoices that grew every month. Thirty-five years later it is still the story I hear most often, usually from someone asking me to take over a project somebody else walked away from.

So we built the company around removing that risk rather than talking about it. Our engineers, our workers and our machinery are ours. We do not rent crews, we do not subcontract the work that matters, and there is nobody standing between you and the people actually building your villa.

The price and the handover date go into your contract before anything starts — with a penalty against us if we are late. If we get it wrong, we carry the cost, not you.

That is the whole promise. Everything else is detail.

Yannick Kluschke

Proof

Selected work.

All projects →
Logistics complex, Dubai Industrial City

Commercial · Dubai Industrial City

Logistics complex

Multiple PEB units delivered in phases — each handed over on its contractual date.

12-storey residential building, Business Bay
Commercial · Business Bay

12-storey residential building

Concrete frame · 12 floors

Concrete basin, Al Ain
Government · Al Ain

Concrete basin

976 t steel · AED 14.3M

Villa construction and renovation, Palm Jumeirah
Private · Palm Jumeirah

Villa construction & renovation

620 m² · 7 months · fixed price

Free · two minutes · no contact required

Know the number
before we visit.

If your budget is AED 500,000 and the work is AED 1,000,000, you should learn that here — not after a crew has driven to your villa.

How it works

Four steps. No surprises.

01

Range online

An honest range from our real rate book, before anyone drives out.

02

Site visit

We measure, photograph, and confirm which authority governs your plot.

03

Fixed contract

Price, date and penalty clause. Staged payments, released after acceptance.

04

Weekly reports

Photo and video updates on WhatsApp every week — even if you are abroad.

Where we build

Palm Jumeirah · Emirates Hills · Arabian Ranches · Dubai Hills · Springs · Meadows · Jumeirah Islands · Al Barari · Business Bay · Al Quoz · DIP · JAFZA

Questions owners ask.

Usually yes. Any change to the structure, the external envelope, the plumbing routes or the electrical load requires approval from the authority that governs your plot — Dubai Municipality, Trakhees or DDA. Cosmetic work such as painting, flooring or replacing kitchen units generally does not. We confirm which category your project falls into before quoting, and we tell you when no permit is needed at all.

It depends on the community, not on the type of work. Palm Jumeirah, Jebel Ali and the free-zone areas fall under Trakhees. Most freehold communities inside the city — Emirates Hills, Springs, Meadows, Arabian Ranches, Dubai Hills — fall under Dubai Municipality. Districts developed by Dubai Development Authority fall under DDA. We identify the authority from your plot number and handle the submission ourselves.

A light refurbishment — finishes, paint, flooring, joinery — typically runs AED 700–1,200 per m². A full renovation including MEP replacement, new bathrooms and a new kitchen runs AED 1,600–2,800 per m². Structural work, extensions and pools are priced separately. The range depends on specification far more than on area, which is why our calculator asks about the level of finish before it returns a figure.

The handover date is written into the contract with a penalty against us for every week of delay. That penalty is ours to carry, not yours. The only exceptions are changes you request mid-project and authority delays outside our control — both of which are documented in writing at the time they occur, not claimed at the end.

For a partial renovation, often yes — we phase the work, seal the active zone and keep one bathroom and the kitchen in service. For a full renovation involving MEP replacement it is not practical or safe, and we plan the programme around your move-out date so the villa is empty for the shortest possible period.

Our licence and our crews are based in Dubai and that is where we build. We have delivered infrastructure and concrete works in Al Ain under separate contract, and the group also builds in France through GREEN LINE SAS. For a villa or commercial project, assume Dubai.

Completed villa in Dubai at dawn

Tell us what you're building.

Answer in minutes on WhatsApp · 07:00–22:00, seven days