Commercial · Dubai
Built to the date
your business needs it.
Warehouses, factories, pre-engineered buildings and commercial fit-out — with a handover date in the contract and a penalty attached, because every late week is rent, storage and idle staff.
What we build
From a single shed to a phased park.
Pre-engineered steel buildings, reinforced concrete frames, cold stores and commercial fit-out — in Al Quoz, Dubai Investment Park, JAFZA, Dubai Industrial City and Dubai South. We take the project from the plot through to authority handover.
01
New construction
Pre-engineered steel buildings and reinforced concrete frames up to G+4 as standard, and up to twelve storeys with an exception.
Commercial construction →02
Fit-out & renovation
Office, retail, restaurant and warehouse refits — phased around your operation so trading never stops entirely.
Commercial renovation →03
Mezzanines & cold stores
Mezzanine floors, cold-store rooms, epoxy flooring and power upgrades delivered while the rest of the facility keeps operating.
See more →Why LV
What the contract actually says.
01
A programme you can bank on
The critical path is almost always approvals, not construction, so we start that first and report against your handover date every week.
02
Auditable pricing
A priced bill of quantities against the drawings — every line you can check, not a lump sum you cannot.
03
Free zones handled
JAFZA, DIP, Dubai Industrial City and Dubai South each have their own approval regime. We handle it as part of the contract, not as your problem.
Where we build
Al Quoz · Dubai Investment Park · JAFZA · Dubai Industrial City · Dubai South · Ras Al Khor · Al Qusais · Techno Park
Free · two minutes · no contact required
Know the number
before we visit.
Get an honest range from our real rate book — before a crew drives to your site.
Request a quote
Send us the plot and the deadline.
We will come back with a range and a realistic programme, not an optimistic one.
Questions we are asked.
A single-storey pre-engineered warehouse of 2,000–5,000 m² is typically seven to eleven months on site, plus two to four months for design and authority approvals. The critical path is almost always approvals, which is why we start that process first.
Ground plus four floors as standard, and up to twelve storeys with an exception granted by Dubai Municipality. We have delivered a twelve-storey residential frame under that route. If your project needs more, we tell you at the first meeting.
Yes — JAFZA, DIP, Dubai Industrial City and Dubai South, each with its own approval process, contractor registration and inspection regime, which we handle as part of the contract.
For fit-out, mezzanines and extensions, yes. We phase the works, hoard the active zone, agree noisy-work windows and coordinate deliveries around your traffic. The dates reflect that before you sign.
Send us the plot and the deadline.
We will come back with a range and a realistic programme, not an optimistic one.