Skip to content
Built to the dateyour business needs it.

Commercial · Dubai

Built to the date
your business needs it.

Warehouses, factories, pre-engineered buildings and commercial fit-out — with a handover date in the contract and a penalty attached, because every late week is rent, storage and idle staff.

DM G+4 · up to 12 storeys ISO 9001 · 14001 · 45001 976 t steel · single contract Own plant and crews Since 1991

What we build

From a single shed to a phased park.

Pre-engineered steel buildings, reinforced concrete frames, cold stores and commercial fit-out — in Al Quoz, Dubai Investment Park, JAFZA, Dubai Industrial City and Dubai South. We take the project from the plot through to authority handover.

01

New construction

Pre-engineered steel buildings and reinforced concrete frames up to G+4 as standard, and up to twelve storeys with an exception.

Commercial construction →

02

Fit-out & renovation

Office, retail, restaurant and warehouse refits — phased around your operation so trading never stops entirely.

Commercial renovation →

03

Mezzanines & cold stores

Mezzanine floors, cold-store rooms, epoxy flooring and power upgrades delivered while the rest of the facility keeps operating.

See more →

Why LV

What the contract actually says.

01

A programme you can bank on

The critical path is almost always approvals, not construction, so we start that first and report against your handover date every week.

02

Auditable pricing

A priced bill of quantities against the drawings — every line you can check, not a lump sum you cannot.

03

Free zones handled

JAFZA, DIP, Dubai Industrial City and Dubai South each have their own approval regime. We handle it as part of the contract, not as your problem.

Where we build

Al Quoz · Dubai Investment Park · JAFZA · Dubai Industrial City · Dubai South · Ras Al Khor · Al Qusais · Techno Park

Free · two minutes · no contact required

Know the number
before we visit.

Get an honest range from our real rate book — before a crew drives to your site.

Request a quote

Send us the plot and the deadline.

We will come back with a range and a realistic programme, not an optimistic one.

Questions we are asked.

A single-storey pre-engineered warehouse of 2,000–5,000 m² is typically seven to eleven months on site, plus two to four months for design and authority approvals. The critical path is almost always approvals, which is why we start that process first.

Ground plus four floors as standard, and up to twelve storeys with an exception granted by Dubai Municipality. We have delivered a twelve-storey residential frame under that route. If your project needs more, we tell you at the first meeting.

Yes — JAFZA, DIP, Dubai Industrial City and Dubai South, each with its own approval process, contractor registration and inspection regime, which we handle as part of the contract.

For fit-out, mezzanines and extensions, yes. We phase the works, hoard the active zone, agree noisy-work windows and coordinate deliveries around your traffic. The dates reflect that before you sign.

Send us the plot and the deadline.

We will come back with a range and a realistic programme, not an optimistic one.