Skip to content
Warehouses and factorieshanded over on the date.

Commercial · Dubai

Warehouses and factories
handed over on the date.

Every week a commercial building is late is a week of rent, storage and idle staff. That is why the handover date sits in the contract with a penalty attached to it.

DM G+4 · up to 12 storeys ISO 9001 · 14001 · 45001 976 t steel · single contract Own plant and crews Since 1991

What we build

Industrial, logistics and commercial.

Pre-engineered steel buildings, reinforced concrete frames, mezzanines, cold stores, labour accommodation and office fit-out — in Al Quoz, Dubai Investment Park, JAFZA, Dubai Industrial City and Al Quoz Industrial. We take the project from the plot through to authority handover.

01

Pre-engineered buildings

Steel portal frames with insulated cladding, from a single 1,000 m² unit to phased logistics parks. Fabrication, erection, cladding and finishing under one contract.

02

Concrete frame

Reinforced concrete structures up to G+4 as standard, and up to twelve storeys with an exception. Foundations, frame, blockwork, MEP and finishes.

03

Fit-out and mezzanines

Offices inside existing sheds, mezzanine floors, cold-store rooms and racking bases — delivered while the rest of the facility keeps operating.

Included as standard

What is in the price.

Anything not on this list is either not needed on your project or is priced separately and shown to you before it is ordered.

  • Priced bill of quantities against the drawings — every line auditable

  • Authority and free-zone approvals: DM, Trakhees, DDA, JAFZA or DIP as applicable

  • Structural design coordination and shop drawings

  • Our own plant, crews and supervision — no labour-supply subcontracting

  • HSE plan, site induction and daily records to ISO 45001

  • Testing, commissioning and completion certificate handover

How it works

Four steps. No surprises.

01

Scope and budget

Plot, use, area and required handover date. We return an indicative range within days.

02

Design and approvals

Structural coordination, authority submission and NOCs, tracked against your date.

03

Fixed contract

Price, programme and delay penalty. Payments staged against measured progress.

04

Build and hand over

Weekly reporting, testing and commissioning, completion certificate in your name.

Request a quote

Send us the plot and the deadline.

We will come back with a range and a realistic programme, not an optimistic one.

Or message us directly — +971 56 511 0046

Questions we are asked.

A single-storey pre-engineered warehouse of 2,000–5,000 m² is typically seven to eleven months on site, plus two to four months for design and authority approvals beforehand. Concrete-frame buildings run longer. The critical path is almost always approvals, not construction, which is why we start that process first.

Ground plus four floors as standard. With an exception granted by Dubai Municipality we build up to twelve storeys, and we have delivered a twelve-storey residential frame under that route. If your project needs more, we tell you at the first meeting rather than after a deposit.

Yes — JAFZA, DIP, Dubai Industrial City and Dubai South. Each free zone has its own approval process, contractor registration and inspection regime, which we handle as part of the contract rather than pushing back to you.

For fit-out, mezzanines and extensions, yes. We phase the works, hoard the active zone, agree noisy-work windows with you and coordinate deliveries around your traffic. It lengthens the programme slightly, and that is reflected in the dates before you sign.

Send us the plot and the deadline.

We will come back with a range and a realistic programme, not an optimistic one.